Professional products (0):View all
Pages (0):View all

RISE WBS75M Whiteboard set 75" for RISE 5XXX

RISE WBS75M Whiteboard set 75" for RISE 5XXX

Slide 1 of 5
Vogel's Product
Vogel's Ambiance
Vogel's Detail
Vogel's Dimensions
Vogel's Detail
Additional options
  • Installed in 15 minutes by one person
  • Height & depth adjustable to fit every screen
  • Adjustable friction hinge
  • Magnetic closure
  • For mounting on the RISE trolley, floor stand

Whiteboard set for 75" screens for RISE 5xxx

The RISE WBS75M whiteboard set is a universal system, suitable for all types of 75" (interactive) displays. This accessory allows you to mount a whiteboard to the left and right of your 75" screen. The enamelled steel boards are attached top and bottom on a Vogel hinge, which retains friction and writing stability even after frequent use. Nonetheless, should the friction become less than desired over time, the hinge can easily be adjusted. This set is suitable in combination with the RISE 5xxx trolley and floor stands and contains one or two counterweights for extra stability. Due to the height adjustment of 985mm, these lifts require a counterweight to meet safety standards.

Turn your display lift into a total solution.

Vogel's whiteboards are available for the three most common sizes of (interactive) screens 65", 75" and 86". Due to the height and depth adjustment of the whiteboard system, the whiteboards can be seamlessly attuned to any type of (interactive) screen.

Optimal learning resource for teachers.

The system's user experience during teaching is central to these products. The sturdy suspension system has a hinge that has been developed in-house which optimises the writing experience. The friction in the hinge allows the teacher to write in open, closed or half-open board formats. The magnetic closure ensures an unparalleled system to screen fit.

Easy to install.

Installation speed and convenience were key concepts during the development phase. The scale on the hinge's vertical and horizontal profile makes assembling the whiteboard set a piece of cake. The values which are subsequently read can be used to install the other side, and multiple other systems in the same way. Enabling the system to be built within 15 minutes.

Various RISE accessories.

All RISE motorized display lifts can be expanded with accessories such as laptop trays, video conferencing camera trays, sound bar mounts or hidden storage units. We offer a 5 year warranty on all RISE accessories. We offer a 25 year warranty on the enamelled steel boards.

Vogel's Ambiance
Get in contact with us

Follow us

facebook
instagram
linkedin
pinterest